FM Port · Mersin

Mersin Project Cargo: Heavy and Out-of-Gauge Loads

FM Port moves heavy machinery and out-of-gauge cargo from Mersin port or the factory to site, with route surveys, special permits, escorts and low-bed planning.

Project Cargo, FM Port Mersin

A transformer, a construction machine or production line equipment cannot travel on a standard truck. Loads that exceed road limits need engineering and planning before they move.

Project cargo starts with a route survey: bridge clearances, bend radii, road load capacity and passage restrictions are checked one by one.

Permits are then obtained, escort vehicles and the right low-bed equipment are planned, and the cargo is delivered safely to site.

Route survey

The route is surveyed for the cargo's dimensions and weight; bridges, underpasses, power lines and bends are checked and alternatives planned if needed.

Permits and escorts

Special permits for out-of-gauge transport are obtained, and escort vehicles and traffic arrangements are planned for the load size.

Port-linked projects

Project cargo arriving by sea at Mersin port can be collected port-side and taken straight to site, with port and road operations run by one team.

Cargo we carry

  • Transformers and power equipment
  • Construction machinery
  • Production line equipment
  • Steel structures
  • Tanks and silos

How it works

  1. Technical data

    Dimensions, weight and lifting points are shared.

  2. Route survey

    The route is surveyed and restrictions identified.

  3. Permits and equipment

    Permits obtained, low-bed and escort planned.

  4. Transport

    The cargo is delivered to site under control.

Frequently asked questions

The most common questions about part loads, container haulage, customs paperwork and storage. For anything specific to your cargo, talk to our operations team directly.

Question not listed?

Call us or message us on WhatsApp; we reply the same working day.

Do you carry out-of-gauge cargo?

Yes, with route surveys, special permits and escort planning.

What do you need for a project cargo quote?

Length, width, height and weight, lifting points, and the loading and delivery addresses.

Why is a route survey needed?

Bridge clearances, bends and road capacity decide whether the load can pass; the survey makes the move safe and permitted.

Can you take project cargo from Mersin port to site?

Yes, cargo can be collected port-side and taken straight to site.

Do you handle permits?

Yes, permits for out-of-gauge transport are part of the transport plan.

How is project cargo priced?

Each project is quoted on dimensions, weight, route, permits and escort needs.

Mersin

Serving you from Mersin

Çilek Mahallesi, 33020 Akdeniz / Mersin